Fit the gutter in place which normally just clips in with the appropriate stop ends connectors and gutter outlet for the downpipe.
How to install guttering and downpipes.
Cut it to length with a hacksaw and removing any burrs with a half round file.
Use a square and pencil to mark the gutter length and cut to the line.
While this temporarily holds the cap in place drill another 1 8 inch 0 32 cm diameter hole and attach a pop rivet into it.
When installing guttering it is vitally important to use the correct access equipment.
Join the gutter to the corner with six rivets in the locations shown.
Working up high is hazardous so also hire scaffolding on wheels to provide easy access and simplify the installation process.
Increasing the pitch increases a gutter s handling capacity but the gutter may look askew over a long run.
The standard is about inch per 10 feet.
Stratco gutters can then be installed using the stratco gutter suspension clip which attaches the gutter to the fascia.
Then trim the first section of the gutter to length with tin snips.
Slide the splices on as far as they ll go.
The minimum gutter fall to a downpipe is 1 500 meaning an extra 2mm of fall for each metre of gutter.
Rivets at the front of the gutter and installing the first rivet with the rivet gun.
Drill pilot holes then fit the.
To establish the position of the running outlet or stopend outlet hang a plumb bob from the fascia so that it.
Begin by installing a slip joint splice on each end of an inside corner fitting.
You can double check the fall with your spirit level.
Now drill the remaining holes and install the rivets.
Start by drilling a 1 8 in.
Use a pencil to mark the positioning of the outlet and its fixing holes onto the fascia ensuring that it is no.
Simple installation stratco fascia is easy to install.
In this video i install some plastic guttering to a brick built garage.
Connect the end cap s to the gutter using silicone sealant and screws.
Before buying talk with your supplier to ensure the gutter system you have selected meets the criteria.
Step by step step 1.