Figure 3 figure 4 clearances maintain a minimum 1 2 clearance between james.
How to install hardie shingles siding.
For example following a stair step pa.
Leave a small gap at butt joints and fill.
N nail lengths should be chosen so they penetrate a minimum of 1 1 4 in.
Apply caulk to the joint before and after installing the siding.
Install your first row per the recommended best practices.
When installing the latest fiber cement shingle panels from james hardie products reading and following their instructions is the key to success.
Fiber cement can also be shaped like siding shakes and shingles that are produced in strips or individual pieces.
While shake and shingle siding are most often associated with cape cod style homes they can add instant character to any style home anywhere.
Install flashing at all end joints where two pieces of siding butt together.
Next cut the bottom of a panel to create a straight edge for the first row.
Hardie siding is made to last for up to 50 years without rotting cracking termite problems or hail damage.
Use 6d or 8d galvanized or stainless siding nails and install a single nail about 1 in.
Remember a 1 4 inch clearance must be maintained between siding and trim and leave a 1 8 inch gap between siding and trim.
Hardie fiber cement siding is a non combustible material and although nothing is guaranteed against fire your home s exterior is better prepared against fire damage if hardie siding is installed.
Do not use stain oil alkyd base paint or powder coating on james hardie products.
Snapped chalk lines help guide installation when installing straight edge panels or individual shingles use a straight edge on bottom edges if uniform straight edge is desired.
Alternatively you can purchase straight edge panel hardieshingle for the first row.
Down from the top edge at each stud no more than 16 in.
Be sure the flashing overlaps the siding course below.
Learn the proper techniques on how to install staggered edge panel hardieshingle siding on your next exterior project.
To find a siding expert now call toll free.
Into the solid wood wood sheathings like osb and plywood count toward the 1 1 4 in but soft sheathings like fiber board and foam don t.
Hardieshingle siding may be installed on vertical wall applications only.
When installing fiber cement siding always leave a gap at the ends of each length of siding.