How to do it.
How to install mineral surfaced rolled roofing.
They are long enough to penetrate the sheathing.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
Install drip edge flashings roofing felt and wsu if needed.
It is secured to the substrate by driving roofing nails 3 4 inch from the edges spaced every three inches.
Push the rolled roofing down into the wet cement to secure it to the roof.
Use 1 nails for re roofing.
You can install metal valley flashing but it is common to.
Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.
Enlist the help of one or two helpers to handle the long strips.
The first layer should cover the roof as far as the chalk line.
Place the first layer of rolled roofing on the roof.
Use 1 inch nails for new roofing.
This is not a how to video.
Apply the first course with a full width strip of roll roofing so that its lower edge.
Place 9 wide strips of roll roofing along the eaves and rakes positioning them to overhang the deck to 3 8.
The first row of roofing material is then rolled out and aligned with the chalk line.