If you live in an area with inclement weather you should consider using a special ice and water protector.
How to install starter roofing.
You will want the roof granular side up when applying the strip.
Install a starter strip.
The adhesive on the starter course seals the tabs of the first full course.
Where do the nails go.
Apply a second layer of sealant around the lip of the vent outside.
Quick installation tips for how to install gaf starter strip shingles on a roof.
Overlap each row at least 3 to 4 inches.
After the first shingle has been placed on the roof set the second starter shingle next to it.
Using your staple gun secure the felt to the roof.
Do not penetrate the shingles with the hammer.
Butt the edges together instead of overlapping them.
First snap a line for the top of the.
Typically the finish shingles are then installed to align with the edge of the starters.
How to do it prep work space.
Use four roofing nails per shingle as indicated on package instructions six nails in high wind areas.
Before peeling the shingle starter strip trim about 4 inches off an end of the first starter strip and align the strip to the area you are planning to stick it on.
Drill starter holes if needed then scew down the vent with the fasteners in the installation kit.
Install new flashing metal.
Whether installed at the eave or the rake the starter shingles should overhang the edge of the roof by inch to inch.
Using four roofing nails or up to six in high wind areas secure the starter shingle to the surface of the roof.
Detailed installation of starter strip shingles at the valleys and hips.
Place the cover over the vent opening and screw into place.
Continuing with the starter shingles.
The end should overhang over the edge about 1 4 to 3 4 of an inch.
Gaf pro series starter strip shingles valley hip install.
If possible have the shingles delivered via a boom directly onto the roof.
Finally nail the first course of shingles directly on top of and flush with the starter course.