First install the strip around the bottom of the entire building securely so that the sheet metal will slip under it easily.
How to install steel panel siding.
Hold a panel at the correct height and against a window or other obstruction to mark for the horizontal part s of a cutout.
Install the corner posts that came with your metal siding first.
Step 3 install the siding.
As you install the sheet metal siding be sure that the panels are lined up straight.
Install metal panels or shingles align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
The corner posts are the pieces of siding that will.
Applying the j channel 1.
This will keep the wall straight as you place additional panels.
Start at the end of one wall and use square up.
J channel is an accessory to the siding that s used to.
Metal panels are made to overlap a few inches in the grooves.
Additionally it comes in all types of surfaces from the wooden log cabin look to the modern shiny platinum look.
Take care the first piece is aligned precisely perpendicular square to the edge.
Measure over from the other panel to mark the top and bottom of the vertical cut and snap a line between the marks.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Nail j channel along the bottom of the wall you re working on.
Always begin working at the point with the longest peak to eave distance.
Have you wondered how to install steel siding on a pole barn.
In this video i show how easy it can be.
Cut 1 4 inch above the flashing or window.
The sheets cover 3 foot so it goes up pretty fast.
Again allow for a 1 4 inch gap.
Place the first siding sheet in place.
Install the roofing screws vertically along each rib in the panel.
Nail the sheet into place using the holes pre fabricated into the metal or nail the sheets to the studs according to manufacturer instructions.
By installing the first panel square the rest will follow suit.
This is the most important step in the whole project in order to keep rain and snow from seeping under.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Begin at the bottom corner of one side of the structure.
Install j channel along the.