Ensure that the rubber membrane extends a minimum of 25mm on to the.
How to install termination bar with epdm roofing.
How to install a termination bar video and installation guide fold back epdm and apply water cut off mastic.
With a pencil or chalk line mark the desired rubber perimeter on the wall and roof edges.
Do not remove the protective paper.
Prior to installation of the termination bar pull back the topside of the membrane flashing 20 mm and apply a bead of water block between the membrane and the wall.
If using water based adhesive the technique involves spreading adhesive onto the roof using a paint roller in sections of three or four feet across the leading edge.
Fold back the rubber membrane over the surface to be joined to.
Full installation of classicbond epdm roof with sure edge trims.
Install the termination bar with an acceptable hammer plug system at 200 mm o c.
This is how to install epdm roofing correctly.
Installing z bar flashing on tpo termination bar.
The bar is 25mm x 3m and has pre punched holes every 150mm on center.
The termination bar is an extruded aluminum bar that s designed for securing and sealing compression type flashing terminations when the water cut off mastic is inserted behind the epdm membrane and lap sealant is applied along the top of the termination bar.
For more information please visit http.
A termination bar must be cut at inside and outside corners.
Apply termination tape to connect the wall and roof tapes so the entire rubber perimeter is sealed.
Metal edge termination epdm detail.
Start with the edge facing the wall and work towards the roof s edge.
Pull the rubber from the shipping box and drag it across the roof.
Do not bend the bar around the corners.