Mark the height needed allowing 1 4 in.
How to install vinyl siding on a peak.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Next measure and cut the siding to fit the measurements of your soffit and push each panel into the j channel.
A great tutorial on how to cut install vinyl siding using just the side track saw table ordinary stanley knife shows cuts around top bottom of a windo.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
When cutting vinyl siding it s usually to go into a corner.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.
Below the top of the foundation but the lower the vinyl siding is installed the better.
As an alternative installation of specific types of drop in contoured foam underlayments for various styles of vinyl siding are available.
You need to leave at least 1 4.
Attach j channel trim strips around windows and doors and along the eaves.
Clearance on each window side.
Holding the siding panel under the window mark the width of the opening on the panel allowing 1 4 in.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Use the wider starter strip.
If you don t cut your siding short when it expands in the summer it s going to buckle.
Next lock a scrap piece of siding into the panel below butting against the window.
It protects the sheathing from rain snow and pests.
Begin by installing the first row of siding on both sides of the deck.
To provide a common reference point measure up 8 in.
Vinyl siding must never be applied directly to studs without sheathing.