Nails and staples must be driven flush with the surface of the certi label shake or shingle.
How to nail cedar shingles roof.
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
Also firing the nails quickly can cause you to miss the skip sheathing beneath the shingle.
Each shingle will have two nails that go in it an inch from either side and 4 inches from the top of the shingle.
In all use four nails per 3 tab shingle.
It is best to use timber roofing battens and counter battens with a membrane to allow adequate air flow if necessary.
Overlap every shingle by at least an inch and a half from where the edge of the roof is.
Make sure to put the thick end at the top on only the bottom row.
Separate shingles approximately 6mm apart.
Using a nail with ring shanks prevents the nail from popping out as your cedar roofing expands naturally.
Also place a nail 2 inches from each end of the shingle in line with the other two.
Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2.
Use two 31mm x 1 8mm silicon bronze nails per shingle.
Overdriving the fastener can split and or distort the certi label shake or shingle.
Spend some time selecting the best face of the shingles and then nail a double starter course.
How to install cedar shingles on a shed roof and walls cover the roof in felt roofing paper install a cedar breather if needed use a chalk line to align the starter course of cedar shingles install shingles using 2 weather resistant nails install the first course directly on top of the starter.
Using a nail gun.
Alternate the direction of the joint.
Do not use electro galvanized eg fasteners.
Cedar shingle and polycarbonate panel roofing.
To avoid this hand nail two nails into each shingle.
However make sure that you do not nail into the tar strip.