The ideal roof for a residential solar system has 500 sq ft 46 m 2 of unobstructed south facing unshaded space sloped at a 30 degree pitch.
How to prepare your new construction for installing solar panels.
In order to prepare your property for solar panel installation you ll need to consult with a building inspector to ensure your roof is structurally sound and capable of housing heavy solar arrays.
Installing solar panels doesn t happen overnight there s a process for what needs to happen to get your panels ready to begin powering your home.
The homeowner or a certified professional must get onto the roof for a thorough inspection and then.
Due to the weight and surface area utilized when installing solar arrays on a residential rooftop it s important to first check the condition of your roofing materials before committing to a solar solution.
Overall from the day you sign your contract with your installer it will typically take between one and three months before your solar panels are grid connected and producing energy for your.
Preparing your roof for solar panels means removing every possible barrier to the installation.
Installing solar panels may require a building permit where you live.
Make sure you have space on your land with unobstructed southern exposure without lots of trees in the way so you don t have to clear cut your land as part of giving you a consult or quote installers will use a solar evaluation device to analyze your solar potential and any shading issues.
2 check the orientation size pitch and shading of your roof.
While most of your solar panel system is on the roof there are some components that need to be installed near your electrical panel.
If you have the option of pre installing the wiring for your solar power system during the build it will make life much easier for your solar installer saving them time and saving you money.
Before you go ahead with any installation make sure that your roof has enough space for the solar panels.
Pre wiring and pre laying your solar panels.
It s much quicker to run electrical wiring before your walls have been gyprocked.
Ensure that your setup can handle a solar panel array.
Space near the main electrical panel for pv inverters and other equipment.