Remove all protrusions such as gutters down spouts and.
How to properly nail vinyl siding.
When installing in freezing weather below 40.
Required tools for this project.
Allow approximately 1 32 0 8mm clearance about the thickness of a dime between the fastener head and the siding panel.
Renail right next to the old nail leaving at least a 1 16 in.
Find the tight nails and cut them photo 4.
If the soffit on your house wraps around a corner you will need to.
Siding must be cut in lengths to provide for expansion.
Install lengths of j channel along the inner edge of the fascia.
Siding the soffit and fascia area 1.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
Gap for expansion wherever siding butts accessories.
Do not install vinyl siding over.
Nail j channel pieces under the fascia.
Allow a 1 4 in.
Keep your nails straight and give your vinyl siding a little room to breathe and you should be covered for the next 20 to 40 years all for the price of a little elbow grease.
Re siding nail down loose boards of existing siding and replace any rotten ones fig.
Scrape off loose caulk and re caulk around windows doors and other areas to protect from moisture penetration.
Measure and cut the soffit.
Understand how to deal with wrap around soffit.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Ideally nails should go in about 1 32 of an inch from each panel s edge although you should read the manufacturer s guidelines for the proper measurements.