The top post will go across the two vertical blocks that will extend them to the bottom side of the trim.
How to put up hardie siding.
In this video i ll show you how to install a cement board product called james hardie trim.
Colorplus touch up kits can be used to cover nicks scrapes and nail holes that may occur over time.
Leave a small gap at butt joints and fill with caulk.
What are some helpful james hardie lap siding installation tips.
Install flashing at all end joints where two pieces of siding butt together.
For accurate fastening snap vertical chalk lines on the water resistive barrier at the center of every stud location.
How to install hardie siding step 1.
Re painting siding colorplus products.
Blind nail your hardie siding in place.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
When taking planks from the pallet for installation avoid repeating the texture pattern by working your way across.
Do not in fill landscaping up to the siding.
Leave a gap of approximately 1 4 between your window and the hardie plank so any leaking water behind the siding has the scope of getting out.
Learn how to install hardiepanel vertical siding products.
Hardie siding does a great job of wicking moisture when it is installed on the wall but when it s uncovered and flat on the ground it will absorb water.
If the touch up area is larger than the size of a dime the use of colorplus touch up kit is not recommended.
Join factory edges and place the cut edges against the corner trim boards.
This video will outline the basics of installing james hardie s fiber cement products.
If hand nailing fiber cement siding use hot dipped galvanized nails and drive the nails into the wall studs.
Install shims to build out wall even with window flange.
Let s just say that this is not the right way to store hardie siding.
Be sure the flashing overlaps the siding course below.
Caulking joints are unnecessary but flashing behind the joints is required.
Hardie board installation will require joints between planks.
Well many edmonton siding contractors forget to cover their hardie with tarps when they pack up for the night.