Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
How to put up rolled roofing.
To seal a plumbing vent spread roofing.
For this heat up the gas burner and push it to the edge of the site where it will be fixed.
Use 1 nails for re roofing.
Make sure the rolled roofing is parallel to the eve of the roof.
Plan so that no two butt joints are closer than 2 feet from each other.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Fix edge fabric roll.
The roll is unwound and laid on the site of the future installation.
How to do it attach first course.
How to apply roll roofing laying begins at the lowest point.
Enlist the help of one or two helpers to handle the long strips.
They are long enough to penetrate the sheathing.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
Snap a chalk line as a guide for the first layer roofing.
Use 1 inch nails for new roofing.
Before you start to fix it you must check its integrity.