You may choose between sheets that measure half an inch or 3 4 of an inch thick.
How to put up roof sheathing.
A helpful hint for installation is to use a straight edge along the cut line to ensure the panels fit best.
Also use more nails and place them closer together to build a stronger roof.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
How to install roof sheathing 1.
Start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
When installing roof sheathing use nails with longer nail shank larger diameter and a larger head than may be required.
When you intend to install osb sheaths try to determine the breadth or the ideal measurement of your choice of material.
The foam panels need to be secured to the roof around every 12 inches for safety.
Provide a 1 8 inch gap between the panels in each row.
Use a straight edge knife or utility knife to cut the panels to size.
Repeat along all of the edges across the entire roof.
Always check for a level nailing surface.
Whether you re building a subdivision or a home reno.
5 steps to proper roof sheathing installation step 1.
Osb sheathing has different textures on both sides as well.
Run a string line over the roof trusses and then either plane the high parts or add packing to create that perfectly straight line.
Lay sheets in rows with the long edge horizontal to the roof bottom.
Nail the panels to the rafters with 8d common nails spaced 6 inches apart.
Provide roof ventilation according to building codes.
Install a layer of roofing insulation as recommended by the roofing manufacturer.
This is an instructional video on how to properly store install space and fasten osb wall sheathing.
Once the roof rafters are perfectly aligned it is now time to prepare for the plywood sheeting.
Preparing your plywood sheets using a string line mark a line to guide the first row at the eaves.
This can be done with a straight piece of lumber 6 feet to 10 feet.
Hammer down any large nails that are exposed by the removal.
This is usually a prerequisite in building codes.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.