A mobile home roof over creates a unique opportunity to completely change the look of the home.
How to roof a mobile.
A roof over can be installed over the existing roof of the mobile home whatever its shape flat sloping or domed.
The liquid rubber must be installed on a mild dry day and allowed to dry for several hours.
There s little to no material removed which can keep costs down.
A felt paper or underlayment of some kind is put down on roof board and then strips of asphalt shingles are pinned in place one overlapping the other side by side from the peak and down to the roof line.
Created with wondershare filmora.
Locate the rafters by feeling around the surface of the roof.
Then overlap the stringers by 6 inches to complete the stretch from one end to the other.
Redo the roof with limited expense.
It is a good idea to determine how you will put your roof together.
As long as you are somewhat handy all you need is a saw drill and tape measure to install your own mobile home metal roof for a fraction of the cost.
The roof over provides a new look to the mobile home making it look more like a site built home.
Liquid roofing is rolled onto a clean and prepared rooftop with a paint roller at a cost of about 600 900 for a single wide mobile home or 1 400 1 800 for a double wide unit and is designed to last about 10 years.
How to build a roof over a mobile home.
Do you want a slanted roof or a flat roof.
Less labor is needed and there are much smaller refuse fees.
In this video we show you how we are dramatically changing the look of our mobile home renovation project by doing some simple roof alterations.
Lay chalk lines across the width of the roof and over the furring strips to mark the location of the rafters.
A mobile home roof over involves placing a new roof or roofing material over your existing roof.
Build a roof over an existing mobile home roof over.
Lay strips of 1 by 4 inch furring end to end and 2 feet apart across the length of the roof.
Build the frame using the 2 by 6 rafters and a 2 by 10 top stringer.
Begin building your roof by starting at each end.
You will need several top stringers but you should begin with the ending frames first.
The new roof may either be placed directly over the old roof or after the old roof has been removed.
The new roof can be installed in 1 2 days depending upon your skill level.
If slanted how big of a.
Asphalt shingle for mobile home roofs asphalt is the industry standard for pitched roofing systems regardless of where the home was built.