Hoist the trusses onto the roof.
How to roof an a frame house.
Past the exterior wall.
Increase the steepness of the pitch in 12 to 22.
Buy it at roofing supply companies or home centers.
To frame a roof start by choosing a roof style like a frame or gabled.
Call your building inspector for local details.
Install additional flashing if needed.
After that to make it flush with the roof of the existing house cut the two outer rafters.
Then gather your measurements by calculating the run rise and length of each rafter segment in feet and the pitch of your roof in inches.
Cover underlayment with tar paper.
Other roof shapes particularly those with dormers or on houses with cathedral ceilings attic rooms or attic storage areas are stick built.
15 asphalt saturated felt underlayment some codes may require no.
Remove the old roof.
2 tools required for roofing a house.
Creating the pitch of the roof to create the pitch of the roof a single piece of wood called a ridge beam is placed along the length of the home.
You have to do it thoroughly so that the rafters sit flush on it.
Subtract the length of the tile that will overhang the roof to allow any off flowing liquid on the roof to flow into the gutter.
On the roof panel of the build roofdialog.
In severe climate regions most building codes require applying it 3 to 6 ft.
Find the hanging length of your tile ask your supplier if you don t have this information to hand.
The resulting angle forms the pitch of the roof.
Nail down the layers.
Stick framing creates a triangle between the rafters and ceiling joists.
Gable and hip roofs may be built primarily of trusses.
Attach the horizontal beam by using a nail gun.
The result of that calculation is your first fix point where the top of your first batten will sit.
Check ignore top 2nd floor.
A collar beam adds strength to the triangle at the middle.
3 10 steps to roofing a house.
This can be done either with many pairs of hands or with the assistance of a crane.
Cover the rest of the roof with no.
1 materials required for roofing a house.
Rafters are placed to the top plate of the second floor and joined to the ridge beam.
To complete this step the wall frames of the building must already be level plumb and square.
Up from the eave minimum of 2 ft.
Make a cutting on one of the sides of the horizontal roof beam on an angle.
Select build roof build roof from the menu.
Use ladders or scaffolding if you are building the roof onto a building that is still a frame.