Chemical stripping is a two step process referring to the need to apply and rinse two chemicals.
How to strip log siding.
The first step in the trulog steel siding installation process is securing starter strips a.
Most log siding is usually 1 5 2 thick.
We used baking soda to strip a solid body stain from this log siding garage.
They are at least 5 inches long and are driven into the center of the log.
The first is the stripper and the second is the neutralizer or sometimes called brightener.
Only raise the undamaged siding 1 to 2 inches from the side of the structure to prevent damage.
The process went smoothly and the customer was extremely satisfied with the results.
2 place the straight slots of a cat s paw tool to the head of each siding nail.
Anytime you make a repair to a piece of log siding you want it to line up with the rest of the siding.
This video is provided courtesy of the weatherall company.
Scrape off the peeling chipping stuff and feather out the edges with sanding very carefully and with a huge measure of preparation and caution about not inhaling or exposing yourself to lead and other heavy metals used in paint pigments.
The stripper step is often a sodium based chemical such as sodium hydroxide which raises the ph level of the wood.
Use shims if needed.
Steel log siding installation starter strip installation.
Tap the back of the.
Oly screws are used for installing logs and half log siding.
Pre drill the hole first and then secure to the exterior of the home with a ratchet wrench.