Step by step roll roofing installation 1.
How too install asphalt rolled roofing.
Install a drip edge around the perimeter of the roof.
How to install roll roofing on a flat or pitched roof with your own hands.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Spread the roofing cement along the.
Prepare roof edges cant strips.
For extra durability you may install roll roofing in two layers.
Place the first strip over the starter strips but don t overlap the roof edge.
Unroll the roofing and cut a strip to the length necessary for your roof.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
To seal a plumbing vent spread roofing.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
It also helps if you first install a layer of roofing felt.
Apply roofing cement to the roof.
Cut the rolled roofing.
Mark a chalk line to identify the end of your first layer.
Do not use the eaves as a guide instead because they can be uneven.
When it s positioned properly nail the roofing down with galvanized roofing nails every four inches along the top and bottom edges.
Modern technologies have significantly improve the performance of bitumen roll materials to extend their service life of up to 15 25 years and made them more universal.
The strips should always be horizontal.
Plan so that no two butt joints are closer than 2 feet from each other.
How to do it attach first course.
Installation tips and guides.
Snap a chalk line as a guide for the first layer roofing.
It is best to apply these strips horizontally.
Installing the rolled roofing 1.
Using a measuring tape measure 35 inches 89 cm up from.
This aluminum flashing protects the edges of the roof sheathing.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.