Measure and record the distance from the bottom of the fascia board to this nail.
Hpw to install gutters.
Rotate the gutter upward until its back edge slips into the hooks at the top of the back of the brackets as shown.
Through the screw mounting hole in each bracket drill a 3 16 inch diameter hole in the front edge of the gutter.
Below the shingles on the high side of the gutter run.
Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
If the fascia board you re installing them on is longer than 35 feet have the gutters slope from the center to each end.
Gutter components are made by several manufacturers and are available through lumberyards.
If you have a choice between steel and aluminum systems which is best.
Getting started part.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Secure the end cap to the gutter with.
Steel is stronger and.
Secure the gutter to the bracket with a 1 inch long 8 32 stainless steel machine screw and flanged nut.
Installing gutters in 18 steps.
To install gutters have the gutters slope downward toward the downspout so they work properly.
When installing gutters set the proper slope by driving a nail 1 2 in.