If your sheathing is not solid you will need to first attach horizontal furring strips.
How to install hardie board and batten siding.
Priming or staining prior to installing your hardie board and batten is a must since this process keeps their quality from being compromised.
Join factory edges and place the cut edges against the corner trim boards.
Hardie board installation will require joints between planks.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.
You nail through the batten to only one edge of the board and let the other board edge float under the next batten he writes.
After a morning.
Since the primer or stain acts as a preservative it gives your board and batten added toughness that will keep them from deteriorating quickly.
Homesteaders and farmers would use sawmills to cut the long boards and the battens were put in place to make the structure as airtight as possible.
Caulking joints are unnecessary but flashing behind the joints is required.
Cut a piece of 6 inch wide steel coil trim about 1 inch longer than the width of a siding board and place it behind the joint.
Prime or stain all surfaces of the board and batten.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
Rdesigns suggests the traditional method.
Here there are you can see one of our how to install hardie board and batten siding gallery there are many picture that you can surf we think you must click them too.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
Nebraska state capitol building rise into view.