After that line the shingle up with the roof and drive two nails through the top corners and one in the center to fasten it in place.
How to shingle the top of a hip roof.
Step 2 determine the prevailing wind pattern for the area.
Step 4 glue and finish with caps.
You want to lay the shingles from the bottom to the top of the valley.
Nailing the shingle will ensure that the rest of the shingles are secured.
Line up the first shingle with the bottom of the entire shingle lined up with the bottom edge of the roof.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Step 3 continue to add more rows.
The guys would cut a second shingle to overlap the back half of the first one.
We are a brunswick county nc.
That s how the guys.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
After both hips were finished the guys would place a shingle along the ridge.
To avoid potential water damage you should begin this project by adding flashing to the ridges and around any.
Step 2 add the first shingle.
Step 1 add water protection.
How to shingle a hip roof.
To make the shingle flush they would cut a short slice parallel with the ridge.
Use the shears or utility knife to cut three tab shingles into three separate shingles to use as cap shingles for the hip roof.
How to shingle a hip roof.
Working on the base of the edges of your hip roof by making use of 2 stacked shingles.
Start at the bottom of one side of the roof at the right or left edge.
You need to trim those shingles so that they fit correctly.
Three bundles of three tabbed shingles equal one square or 100 square.
The hip shingles continued all the way to the ridge and that last shingle was cut to length so as to avoid covering the open ridge rafter.
As described earlier use a utility knife and straight edge to cut at the slots in the shingle effectively creating three equal sized pieces of ridge cap from one 3 tab shingle.
Bending and overlapping these flaps the guys would put two more nails to anchor it in place.
Then your first shingle goes on the side you are going to cut.
The next one goes on the low side.
Cut the necessary number of pieces for the ridge cap from the 3 tab shingles.
Weave and cut the valley on the highest side of the roof.
Install the flashing on the ridges and tin strips along the edges of the hip roof to provide additional protection against water damage.
Using a utility knife trim the right or left sides of your shingle depending on the end you started at so that it fits the angle of the roof.