Allow a 1 4 inch gap for expansion wherever siding butts accessories.
How to start installing vinyl siding.
How to install vinyl and aluminum siding and step 2.
You are not going to set it hard.
Install starter strips trim.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
This is one of the most crucial steps in installing vinyl siding.
From the top of this row and stretch a string line across the deck.
Choose the right nails allow approximately 1 16 in.
To provide a common reference point measure up 8 in.
This article is a continuation of the discussion that began with step 1.
Vinyl siding must be nailed so expansion and contraction are not restricted.
This is our most comprehensive.
Between nail head and vinyl.
The corner posts should run from 3 4 inch 1 9 cm below the bottom of the starter strip to just beneath the eaves after the soffit pieces have been installed.
The siding slides behind vinyl siding trim pieces that hide the gap and the cut end.
We cover how to move doors and windows and create a weather proof exterior.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
Refer to important notes for more information on water resistive barriers.
How to prepare walls for vinyl or aluminum siding.
This begins with techniques for preparing the existing wall and moves through installation of all siding and trim.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Install flashing before starting to apply the siding.
Install the corner posts.
Begin by installing the first row of siding on both sides of the deck.
A flat level wall surface is necessary for proper installation of vinyl siding.
Now you re ready to begin installation of the starter strips and corner posts that receive the siding panels.
Gap at all ends.
Install 1 2 inch 12 7 mm foam sheathing strips on both sides of each corner then install your corner siding pieces to these strips.
This will allow movement when it expands or contracts.
Siding must be cut in lengths to provide for expansion.
Not just another vinyl siding installation video.
Never nail the siding to your house hang it.