No one of this affirmat.
How to tie roll roofing into a shingle roof.
The first layer should cover the roof as far as the chalk line.
A flat roof isn t actually flat.
Run a line of shingles from the top butt it against the bottom row of shingles on your home and lay them along each edge with the tabs facing inward.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
The flashing should double lap the roll roofing.
It appears to be flat but it needs a slope to allow the water to drain from the roof.
It has a slope of 2 3.
At this point your will have a starter row at the bottom and a row of shingles along each side.
For slopes less than 9 5 we cannot install roof shingles.
Instead the roof must be done with a modified bituminous membrane e g.
Even though the higher roof was installed first the end result.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
Everything should lap just like shingles.
Push the rolled roofing down into the wet cement to secure it to the roof.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
The most trusted miami roofing contractor professionally describes the installation of thi.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
As with applying shingles to any roof invert the bottom row of shingles for your starter row.
Armourvalley or other materials like epdm pvc or tpo covering.
Roofing nails to the existing structural sheathing.
String the line along the top of the frame until it meets the shingle roof.
This video shows the transition of a shingle roof to a metal roof.
Mark this point of the.
In this video i show you how i do the valleys on a shingle roof.
Dbower for a roof that new tinner pretty much summed it up.